Project Description

Located at the end of Runway, 9/27, just east of Clairmont Road, this renovation at Dekalb Peachtree Airport began with the removal of existing pavement. In addition, Astra Group performed grading and installed drainage and a detention pond. Astra also designed and constructed hangar facilities, including the taxiway pavement, access road, sanitary sewer and landscaping surrounding these hangars. Three small “T” design hangars with room for 13 aircraft were built, along with one large “T” design, with room for ten aircraft, and one small box design to accommodate four aircraft.